The SodLane Process – Step by Step
We combine soil-first preparation, premium farm-grade sod, and precision installation to deliver a flawless, even lawn from day one. Smart irrigation setup, clear aftercare guidance, and optional maintenance plans ensure fast rooting, consistent color, and reduced water use. With transparent pricing, reliable timelines, and clean worksites, you get professional results with zero hassle.
  • Consultation & Measurement
    We walk the site, assess sun/shade, slopes, traffic patterns, irrigation access, and calculate exact square footage — including edges and off-angles.
  • Variety Selection
    We match turf to your climate zone, sun exposure, foot traffic, and maintenance goals. You’ll see sample plugs and a side-by-side comparison of color, blade texture, and growth habits.
  • Soil Testing & Amendments
    We sample the top 10–15 cm and test for pH, nutrient profile, and organic content. Based on results, we add lime/compost/gypsum/sand to optimize structure and drainage.
  • Removal & Subgrade Prep
    Old turf and weeds are cut and removed. We till, rake, screen, and fine-grade the subsoil, shaping for proper runoff and smooth transitions at sidewalks and beds.
  • Irrigation Check
    We verify coverage, adjust heads, set preliminary watering program, and install rain/soil sensors if included.
  • Sod Delivery & Installation
    Fresh sod arrives and is laid the same day. We stagger seams, tight-fit edges, and roll for full contact. Immediate deep watering follows.
  • Establishment Window (Days 1–21)
    We guide watering and mowing, schedule check-ins, and adjust as needed. By the end of week 3, turf typically knits and withstands normal use.
  • Long-Term Care
    We offer ongoing maintenance plans and seasonal services (aeration, topdressing, overseeding) to keep density and color at peak.
Made on
Tilda